Taitou Town Industrial Park, Shouguang City, Shandong Province [email protected]
The project starts from the Urban Terminal Building in the Startup Area of Xiongan New Area and ends at the North Terminal Building of Beijing Daxing International Airport. The main line of the railway is 83.2 kilometers long. Among them, the length ...
The project starts from the Urban Terminal Building in the Startup Area of Xiongan New Area and ends at the North Terminal Building of Beijing Daxing International Airport. The main line of the railway is 83.2 kilometers long. Among them, the length within Xiongan New Area is 34 kilometers, the length within Langfang is 43.6 kilometers, and the length within Beijing is 5.6 kilometers. There are 7 stations set up, including 2 stations (viaduct stations) within Langfang and 5 stations within Xiongan New Area (2 viaduct stations and 3 underground stations), and 1 vehicle depot is set up. The Express Line project from Xiongan New Area to Beijing Daxing International Airport is an important trunk line included in the "Four North - South and Two East - West" high - speed railway network of the New Area.
Main materials:
◎ Special non - curing rubber asphalt Waterproof Coating
◎ Polyurethane building Sealant
◎ Polymer cement waterproof Mortar
◎ Cement - based crystalline penetrating waterproof coating
◎ Water - swelling polyurethane waterstop adhesive
Copyright © 2025 Shandong Jinding Waterproof Technology Co., Ltd. All rights reserved. — Privacy Policy